Showing posts with label tiles. Show all posts
Showing posts with label tiles. Show all posts

Thursday, February 19, 2015

Sleeping on the Job

0 comments

I have been sleeping on the job; I have to get back on track.

Having Howard and Mike over for dinner felt as comfortable as entertaining at home, but there was a learning curve involved. We have become accustomed to shopping in Budapest, knowing the stores, our butcher and our green grocer. We are familiar with which products to buy where. We intimately know the variables of our stove and oven; there are rarely surprises.

When you are in a different city and home, everything starts from scratch. Sure, we have been shopping here and cooking, but it is for us. If calamity strikes, we only have ourselves to blame. Do not get me wrong, Mike and Howard are not intimidating dinner guests; if things went south, they would be gracious. They are from Georgia after all, so they know when things go south.

Well, I am pleased to say we managed to get decent pork chops, find enough ingredients to combine with them for a delicious meal that Ron put together. Ron has been master chef almost every night, expanding his cooking repertoire with strange new edible ingredients and experimenting with items we cannot translate.

Dinner was as delight with fun company. We have been enriched this trip so far by having Mike and Howard to share social events with; we are maximizing the time. We will have dinner with them and a horde of others at Joe’s Secret Garden this Saturday night. There will be more about that after the event.

Having Howard and Mike over, gave us a hankering to try the metal museum once again. When we were there with them, we did not have any luck. It was closed.

Ron and I ventured over. Once again, the sculpture of the man evolving from the volcano really had an impact on me. There is something emotional here that is beyond description.  An energy overtakes me as I scan each piece of tile used to create it. The last time, Howard had posted a few pictures on Facebook. One of his commenters mentioned how she would like to photograph each tile. This made me wish I had done this. Today, I did photograph a number of the tiles that really spoke to me in various ways.

Can you imagine being this artist as a child and having to

write out his full name all the time?

Of course, the museum was still closed, so we never did get in. We waited beyond the reopening hour post lunch of 2pm, but by 2:45, it was still shuttered. 


On our way back to the bus, Ron was hungry for empanadas. Just by luck, we found Las Empanadas de las Herrerias on our way. We ordered two of each: carne, queso, and pollo. This was dinner. They were delicious! The crust was flaky and light while the insides of the meat options were stuffed with juicy meat. The cheese ones were good too, but not moist. This would be a return to place if we were here longer. 

Pin It Now!

Sunday, February 08, 2009

Measure, Measure, Measure

0 comments

Size DOES matter, regardless of what anyone says. Before we ordered the tiles for the walls, our tile man measured and told us how many square meters we would need. It was after this that I convince Ron we really needed to redo the floor also, but it was up to us to do the measurements. We just showed the tile store the measurements and left it to them to figure out the number of boxes we needed. It was only the day before they were delivered that it occurred to me that our baseboards were also tile, not wood. After searching the tile stores' catalog again, I was assured that they did not carry baseboard tile, so called Anna, our liaison translator in a panic. She assured me it would not be a problem. The tile man would cut tiles and make a baseboard. Whew! Well, relief for a matter of minutes only, when it next dawned on me that we would not have enough tile to cover the floor and to cut up for baseboard. The tile order took two weeks. Today, this trauma was reinforced by our tile man. We decided we would get any color tiles from the Practiker store, like the local version of Home Depot. These would be hidden under the cabinets and then the saved tile from there would then be used for baseboard. We traipsed off to the store today, so he could finish up tomorrow. With our grocery trolley in hand and a giant Ikea heavy duty bag, we set off. Miracle upon miracle, Practiker had the identical wall tiles we already had. We needed two more boxes (30 pounds). We needed to pick up three boxes of grout at 5 kilos a box. For those unknowing, one kilo equals 2.2 pounds. The last item on our shopping list was two more boxes of floor tiles. We found a darker color in the same product line as what we bought for the floor already and thought this would make a nicer accent than monotone floor and baseboard. Each box is 20 pounds. I have to say that the employees at Practiker were beyond helpful and friendly from start to finish. We put the two boxes of floor tiles into the shopping trolley on wheels, but we could only fit one box of the wall tiles on top of it. The three boxes of grout and one box of wall tiles had to go into the Ikea bag. It was too heavy for either of us to lift alone. We had to each grab a handle. Now the trick was getting this on two trams and then three blocks home. By the time we reached the first tram and packed everything on, both wheels of the trolley broke off. Kaput! Never to be fixed again. We seriously thought of a taxi at the end of the line, but neither of us brought our phone. When we did get to the end of the first tram line, one of us was going to go home and call a taxi while the other waited. However, I had a better idea. We found someone waiting for the tram, a really nice African man. Explained what happend and he called a taxi for us. All that was left for us was to drag the stuff upstairs on the elevator. I think both of us were thinking heart attack by the time we finished. This is the progress made today. The electric outlets are wired, the walls were prepped, and Sandor put on all of the wall tiles today.

Pin It Now!

Saturday, February 07, 2009

The Real Nightmare That Did Not End

0 comments

This is where they finished off last night. The tile man arrived shortly after 8:00 am to start ripping out the tiles. The good news is that he proclaimed the floors and walls in good shape under the old tile, not causing any surprises or extra work. We are having a number of extra electrical outlets put in so that means coordinating with the electrician. Then there was a problem with the gas pipe to hook up the new stove, so that will be dicey also.

Pin It Now!