Showing posts with label tile. Show all posts
Showing posts with label tile. Show all posts

Wednesday, March 17, 2010

Potty Training

0 comments


For the last week, I have been in potty training all over again. It seems that I have to train myself to like the new potty tiles. Though it is not what I wanted had I had the time to shop the limitations of choices, but I have to admit it doesn't look half bad. 

When our tile man told us we could not hold off on the wall tiles, they had to be done at the same time as the shower tile, we flew from store to store. Six weeks ordering time here, eight weeks before delivery there, so we bit the bullet and went to the over-sized hardware stores. They keep stock on hand. After deciding on the least of all evils at one store, having bought a sample for 500 Huf, we went to the next. There I found tile that would have been perfect. Notice the conditional "would". Of seventy-two different tiles, this was the only one they did not have in stock. This bathroom is a curse and cursed. Settling for the same design in a lighter color, we were set. Delivery charges - 10,000 Huf about $60. There is no way we could have hauled the boxes home on the tram.

Sandor our tile person has been working like a champ. He knew I don't like the tiles, so he has been trying to persuade me they are not so bad after all.  We decided to repaint the ceiling too. Sandor has a friend...not expensive either. I think that will help with an attitude shift.


The plumber returned today and put in the shower floor so Sandor could finish the surrounding tiles and reinstall our glass block wall on one side. Tomorrow, the painter comes to paint the ceiling and Sandor will finish all of the grouting. On Friday, the plumbers will come one last time to reinstall everything associated with water. Sunday, we have a cabinet maker coming to show us colors for a custom medicine cabinet I designed.


Tuesday, we have four B and B guests arriving. Biting my nails to the quick over timing, I am able to relax a bit now. With so many workmen in and out of the place every day, it will take some time before I get over my expectations of  guests of doing something constructive like slap some tiles on the wall, put in an new electric outlet, or coat something with paint.
Reblog this post [with Zemanta]

Pin It Now!

Sunday, March 14, 2010

Nightmare on Akacfa u.

1 comments

The nightmare continues. The tile guy has keys to the apartment, the plumbers have keys to the apartment and all of this was because the release for the front door was not working. At the same time, the elevator decided to go on vacation, so it was improbable that we would run down the stairs to let people in. At the time, I still had bronchitis, causing Ron to have to make the commute up and down. God knows, he does not need the exercise.

Each morning in the wee hours when I get up to use the bathroom, when I stub my toe on the toilet, because it is sitting in the hallway just outside the bedroom door, I realize I have limited choices. There is no choice, but to turn on the hall light when getting up in the middle of the night. It is like an obstacle course filled with boxes of shower parts, the new shower floor, shower glass walls, glass blocks from our past shower wall that will be resurrected in part, boxes of tiles, a toilet, a bidet, a sink, oh and yes, the washing machine too. This is like a recreation of The Beverly Hillbillies, Hungarian style. 

Sandor, out tile man is an excellent worker. He did the tile in our kitchen, the walls and floor. We had him return to do the hallway floor. If it had not been for the rotten pipes, this would have been winding down by now. I think there is light at the end of the tunnel, but for now it is as bright as a match across a football field in daylight. That is the extent of my sports metaphors. I filled that lifetime quota finally.

The worst part is the bathing. It is not easy fitting under the kitchen faucet. Seriously, we do have to wash our hair there, but the 1/2 bath has no hot water. They had to rip out a lot of that wall too to replace pipes. The plumbers will not return until all of the tile work is done, so we are stuck. I have thought of booking a room at he IBIS just to shower, but Ron would stroke out. He is an old country boy after all, so this just brings back memories of his youth.

Tomorrow is a national holiday, the anniversary of the 1848 Revolution. Although the country closes up on national holidays, Sandor said he would work. The crux is that since it is a national holiday, he cannot make noise that may disturb the neighbors. They were not quiet and mincing around 162 years ago on that date, why should everyone have to be quiet now?

Shower me with good wishes, I will take any kind of shower I can get.
Reblog this post [with Zemanta]

Pin It Now!

Wednesday, March 10, 2010

Showering in Angry Tears

0 comments


Any reader knows, we have needed to reconstruct our large bathroom for some time now. We have had a leaking problem into the 3rd floor apartment's bathroom for over 2 years now. You can see the dozen related posts if you are interested.

When we returned from vacation, Ron went to the local bathroom showroom to find a definitive person to diagnose our woes. After cutting a portion out of our glass brick wall and then the tub, they found the leak. Prognosis: the tub has to go and so do the pipes under it. Up to this point, I was having visions of sugarplums dancing in my head. Opps! Wrong metaphor. I was having visions of Martha Stewart sweeping through to glamorize the new remodel. When my feet touched the ground again, I did major Internet searching for bathroom designs and remedies. 

I still have not settled on a theme or color scheme when the emergency sirens, bells, whistles, and alarms sounded sending us to a bathroom showroom far, far away from the one around the corner. There we choose a new shower with glass door. Our glass block wall will be replaced on one wall. Okay, I have resigned myself to no longer having a tub. I am going to miss that once-a-year, long, leisurely bubble bath that I indulge in, but in reality, I am too hyper for baths. I can spend a half-hour in the shower, but not sitting in the tub. Too many movies that portrayed the tub as some romantic bastion of refuge alone or sharing, so those delusions linger in my memory.

Here is the difficult part...ordering tile. Yes, agreed, I am a spoiled American when it comes to wanting choices. When I had my bathrooms remodeled in California, it took me weeks to make decisions about tiles because the choices of tiles was so vast. Materials, colors, textures, coating and so on kept me awake at nights visualizing, planning, and scheming. Here there are no such problems. There is boring, less boring, least boring. When you finally find something that could actually seem livable, it turns out that it was a sample glued to the display board for the showroom in Kazakhstan and was never removed when put on display here.

Under duress, I picked out tiles, mosaics, for the shower walls. They were shade of dark blue, royal and navy. This would not have been my first pick, but I had perused the web sites of a half a dozen tile stores and found nothing more interesting. Ron put his foot down on ordering from Italy or Spain. I could live with this tile. It would not have been my first choice had I had choices, but I could live with it. There was something unnerving when the lady wrote up the order. I just had "that feeling", but without the language, I could not say anything other than point to the tile sample we wanted repeatedly. She kept responding with "Igen!" meaning "Yes". That was over four weeks ago, because no one keeps stock on hand. It has to be ordered. If a store needs to run from the tax office, they don't need to worry about liquidating stock. Now you see them, now you don't. 

Four weeks later, our tile, shower, shower head and the pipes arrive. I know immediately the tile is not the tile we ordered. It was on the same display board, but not the same tile. This tile is shades of azure blue with mottled salmon mixed in. The surface is flat, not the textured type that I ordered. The real dilemma is that the bathroom is totally ripped bare. All of the old tile is removed, the toilet, sink, bidet, and bathtub are all missing in action. What was once a water closet is now a vacant shell that resembles a bomb shelter after it was bombed. There is no option for returning the tile and ordering anew unless we want to be without a functional bathroom for the next four weeks while a new order comes in. My sense is that the tile we wanted was no longer available, so the woman gave us the second best option. Hey, after four weeks, who will remember what they ordered. Um, duh! We weren't drugged or drunk at the time. There was no blackout to distort the memory.

Now to add insult to injury, I thought I would have time to shop for the balance of the tile for the rest of the walls. Hell no! It all has to be done at the same time for humidity leaking reasons or some such nonsense. I think it is because the workers want to get it done and move on. Having been home sick for the last two weeks, I cannot go running around tile shopping. The doctor has me home bound until Friday. Friday, I am out of here like being shot from a cannon into the stores to find the rest of the tile where it is ready for delivery. I will have my bottle of aspirin in one hand and my sobbing towel in another.

For the whole hairy mess, click on the photo below to see the album of current events.

    
Bathroom remodel
Reblog this post [with Zemanta]

Pin It Now!

Monday, February 08, 2010

The Big Drip

0 comments


Once again, we revisit that seemingly never ending saga of the bathroom drama. Spanning about as long as many soap operas, this leak has been causing a problem for over two years, fifteen plumbers, six housing association inspectors, and irate neighbors. When it had started to leak through our hallway wall, I really anticipated that the problem would be found in the smaller bathroom, not the tub. 

Again, it was an issue with the neighbors downstairs, so Ron took over. We had the home owners association's plumber come yet again, but he would not do a thing unless we cut a hole in the glass block wall. It seems there is a little door in the middle of the tub in an inverted space. When we covered it with glass blocks, we were told it was a foot hold so women could bend over the tub by bracing their feet there and avoid sliding. Ron went to a bath store around the corner and they had workmen who would come out.

They removed a small portion of the glass and then removed a portion of the side of the tub, making it still usable, but delightfully unattractive. There are rotted pipes, which were originally cushioned with foam rubber that has deteriorated. What is left of the foam gets soaked with leaking water. Their solution was to take the tub out completely and replace it with a stall shower. This will give us room to move the washing machine under the window, thereby giving more room by the bidet. They mapped out a floor plan and it all seemed reasonable.

We went to their showroom, which is not around the corner, but in the 4th district, quite a distance away on the blue metro. They showed us the shower floor, had us choose doors, and they will replace the end wall with the glass blocks. We had to pick out floor tiles and wall tiles for inside the shower. We ordered enough floor tiles for the entire floor, but I am not sure if I want all of the walls in the same tiles I picked out for the shower. What really gets my goat is that no tile store seems to have an extensive selection. When I remodeled the bathrooms in CA, when I went to tile stores, I was overwhelmed with selections. Here, I feel like I am being held hostage at the choices and it is not just this one store. I have been to others, but I am spoiled by US variety. Then it came time to calculate costs of materials and labor... ONE MILLION, THREE HUNDRED THOUSAND, rounded off. That is without tiling the entire bathroom.

Anna comes to the rescue. Anna was a Hungarian Fulbright exchange teacher to the US. She exchanged places with Jennifer N. who we have become good friends with. As a result, we have seemed to absorb Anna into our lives. She is an angel and gracefully comes to our rescue at will. We had to call her a couple of times from the store, because my student translator was at work. She was so gracious, but later told us it was way too much and the tile guy who did our kitchen and hallway could do the work for much less. Then it became a hassle trying to schedule the arrival of the materials on March 8th with the workmen to do the plumbing, and then Sandor to do the tile, all the while not losing too many days of not being able to shower and getting it all done between guests coming and going. We are still working on this one, but Anna is convinced Sandor can do it all and honestly, we love his work, so that is find with us.















Reblog this post [with Zemanta]

Pin It Now!

Monday, April 20, 2009

Hallway Tile and Democrats

0 comments

When we arrived home last night, there was a piece of cardboard in front of our door that had STOP written on it in English. We were not sure if it was a warning from the tile man or an omen left by a burglar. To our great relief, it was the former, so we tip-toes over the newly grouted tile until it had time to dry completely. It looks magnificent. He perfectly lined up the tiles with those in the kitchen, so it looks like one straight line. Although I should have been reading students' essays, I did spend the day arranging books on the new bookcases. I cannot work in chaos, so have to have everything in order before setting down to a task at hand. Normally, my stress reduction technique is to clean a closet, but they were done so recently, there was nothing left to do. Arranging books is the secondary mind flush experience. A good mind flush is definitely in order now. I had allowed myself to be nominated as the Nominations Committee Chair for the Hungary chapter of Democrats Abroad. It seemed like a simple enough task, when I agreed to it. Come into my web said the spider to the fly. It just turned into another of those bait and switch experiences that melts your mind and makes you question the meaning of life. The two men and I use the term loosely, who were running for Chair of the chapter were at each other like two five-year-olds, using the mailing list as their forum. They each wanted to conform the rules for the election to their own liking, which meant the International Democrats Abroad had to be consulted for rules and regulations. I had to set up a temporary fax service and the International created a special e-mail box for those who wanted to vote absentee. The results of the mailbox will not be released to me until Wednesday afternoon. The election is that evening. The infighting was worse than any national presidential election, causing me pause about being a Democrat at all. After I created the ballot, when nominations were closed, some complained that they were supposed to be on the ballot, though they did not think to nominate themselves or ask anyone else to do so. My committee of three were either out of the country at the time or just non-responsive to my missives and requests for assistance. With all of the e-mails going back and forth, this turned into a part-time job, causing much regret on my part. When Wednesday comes, I will celebrate and then purge my mailboxes of hundreds of e-mails.

Pin It Now!

Friday, March 20, 2009

Such a Busy Day

0 comments

It is with great pleasure that I report that the kitchen is finally 100% completely remodeled. The doors that were without glass fronts have now been replaced with the matching doors of their neighbors. Six doors were supposed to have glass fronts, but the contractor misunderstood. He only installed two doors with sections for glass, making it look ludicrous. It was cheaper all around to replace the two with solid solid doors rather than four more with glass. It looks great. He also added matching floor boards at the bottom, and on the sides that show, so they are no longer anemic white. I love the granite looking sink. It is so much easier to keep clean. The stove is a marvel. We also had 14 boxes of tile delivered. In the next month or so, between guests coming and going, we will have the tiles replaced in the hallway to match the kitchen. Each little change makes this more and more our own, evicting the ghosts of tenants past.

Pin It Now!

Tuesday, February 10, 2009

Phase One Completed

0 comments

When we were stilling living in California, we had both bathrooms remodeled, in addition to many other jobs requiring contractors of one sort or another. In my experience, it was rare when a work person, showed up on time or even on the day they promised. Sandor, our tile man has been here at 8:00 am each day as promised. Today was no exception. This was the last phase of his work. He had to cut the tiles to create the baseboard and then grout the walls, floors, and baseboards. He was not satisfied when we said not to bother with tiling the baseboard area behind the radiators. They are flat and low to the floor, so it would not be noticeable. He, however was not satisfied with this, so cut them so that they could be slid from underneath and up. By 3:00 pm, he was finished. It looks so good, we are going to have the hallway done in May, matching the tiles from the kitchen to have continuity. We have to rid the place of dust. There is dust everywhere, even in the medicine cabinet in the large bathroom. Tomorrow, the electric gets finished off and the stove is delivered.

Pin It Now!

Monday, February 09, 2009

Construction Worker Tango

0 comments

Good to his word, the tile man was here again at 8:00 am to start putting down the floor. He said that it would be ready to walk on by Wednesday, the day that the cabinet makers were returning to do that installation. This left the stove/oven installation, but first we had to go pay for it. We wanted to give them money when we first looked at it, but they said it would be better to pay when we arranged delivery. Anna, our interpreter called to say we should have the stove there on Wednesday so the cabinets can be installed around it. We walked down to the appliance store; it is just down the street from us. The wonderful gentleman we spoke with on our first visit recognized us immediately and said "I have bad news." Those are four words you don't want to hear when you are trying to coordinate a number of laborers in a language you cannot communicate in and have to use the sister of one of them to translate. The bad news could have been worse. They sold the stove hood, but not the stove. At first they could not deliver on Wednesday due to some mysterious problem. A call into Anna to tell her, but she said it was ridiculous. Her brother the cabinet maker was coming in from the country on Wednesday specifically and could not change their days. We just turned the phone over to the salesman. He finished with Anna and gave us the phone. She would have to call her brother and call us back. Four minutes later, she called and her brother would come Thursday. As she was telling Ron this, the salesman was telling me he did manage to arrange delivery on Wednesday. Yikes! I am so confused now, I am overjoyed that I start school tomorrow and Ron will be here to deal with anything that happens on Tuesday, Wednesday, and Thursday. Except for the hood, we should be complete by Thursday afternoon. Ron had the foresight to ask our salesman to call the company that would need to hook up the stove. There is only one, not the gas company, who is authorized to do it or the guarantee is void. With an oven with ten different functions, I want it working all the way through its three year guarantee. It has only been days, but it has felt like a whole lot longer. When this is over, I am putting Anna's name in for sainthood. This has turned into a part-time job for her. We gave her a gift certificate for dinner out for two, but we will have to do more by the end of this adventure. The tile man will return tomorrow to do the baseboards and then grout the entire tile work and he is out of here.

Pin It Now!

Friday, February 06, 2009

Remodeling Hell

0 comments

Kitchen cupboards are like any other closet. You never know how much you have stashed in them, until you have to empty them out completely and find a place to store all that crap for an indefinite period of time. Ron did the lion's share of clearing them out while I read student theses, but we completed the finishing touches this afternoon in time for the cabinet man to remove them all. The tiles arrived, sitting in the hallway, in front of one the two doors to our bedroom. Now that they are here, they look different than in the lighting of the showroom. God, I hope we did not make a mistake. However, the choices here are not the extensive range as in the States, so we were not as flummoxed when making choices. The cabinet man and his brother showed at 3:00 pm. By 8:00 pm, not only did they remove the cabinets, but the sink, the stove, and the fridge. The kitchen is empty except for the table, but we removed the inserts making it comfortable for two rather than eight. This is what our kitchen looks like in stages of mass destruction. I had forgotten the hideous green that it was painted when we first moved in here.

Pin It Now!

And Now the Fun Begins

0 comments

Yesterday, we went down to the tile store and shock upon shock, the tiles were in on the day they were promised. Good timing. The cabinet man is coming today to take off all of the cabinets. Tomorrow, the tile man is coming to remove all of the wall and floor tiles. He was over a few nights ago to remove a part of one tile to check the floor underneath. He proclaimed it in great shape, so all systems go. There will be no sleeping in tomorrow morning after 8:00 am, but no worries, I am usually up by 7:00 anyway. Ron will have to make up an hour of his sleep somewhere along the way. We hoped against hope we were going to be able to circumvent this work with guests, but we had a booking I responded to while in Australia and had forgotten about. A young woman arrives on the 11th for five nights. We have a couple coming from Stockton, CA our old neighborhood on the 13th. Because I hate surprises, I sent both of them a warning letter and promised to make their stay as uneventful as possible. The noise should all be over by then, but the kitchen may still be in an uproar. In the meanwhile, I have found an excitingly effective resource for selling things. There is a web site here called Ex-pat Loop http://xpatloop.com/. For years, I have tried selling old furniture or other things we wanted to dispose of on various local English speaking websites, but without any success. Just by serendipity, I registered and put in an ad for the old sofa bed we replaced in the small bedroom. Within 24 hours, I had four people inquire and ask for pictures. I took pictures, posted them into the ad and last night, the sofa bed found a new home. On Monday, a gentleman is coming to pick up the HP Deskjet V40 I advertised. At this rate, we just may go through our storage unit in the basement and clean out. When we bought the apartment, we bought it furnished, but over the years have been replacing furniture with new items more attuned to our own taste and sensibilities. It is not that I am out to make a killing on these sales, but it does relieve space. The old sofa was clogging our bedroom for more months than I care to remember. Now let's see, what else is hanging around I can sell?

Pin It Now!

Monday, January 26, 2009

Kitchen Remodel

0 comments

Before we left on vacation, we decided the kitchen needed remodeling. One of the former Hungarian Fulbright teachers who had gone to the US for a year, has a brother who is a carpenter. We have been in touch with her thanks to our friend Jennifer, who was the exchange teacher from the US here in Budapest. We are having the cabinets replaced and in the process adding more where there is currently wasted space. Some of the oversized drawers are being converted from three to five draws. Most importantly, we are making room for a larger stove/oven. We picked out the cabinets and the counter top before we left. I am disappointed that our first choice of counter top is not available, so we had to settle for number two. The cabinet sample is darker than it really is in reality. It is a shade or two lighter than it looks here. Yesterday, we went to pick out the tile for the splash board and the floor. We also picked out the new stove/oven. It is everything I could want with ten functions: regular oven, convection oven, broiler, combinations of the three, and it is self cleaning. Yahoo! The last thing we have to pick out is the new sink. The double sink we have now has an attached drainboard. Being stainless steel, it has become corroded over the years with our mineral infested water, so the new sink will be built in. The tiles should be here by February 5th, so we will press forward after that. I cannot wait to get started, but more importantly, I cannot wait until it is all done.

Pin It Now!

Tuesday, April 03, 2007

The Wall

0 comments

Strangely, I ran into the complaining neighbor from downstairs who has not bothered us since they ripped open our bathroom wall to fix the pipe. Well it was not so strange to run into her, but I did ask her if she heard anything about when they would come to do the repairs of the things they destroyed. She assured me it would not be until after Easter Monday, a holiday in Hungary. About 4:00 pm, the doorbell rings. The people from the building management are there to look at the hole. Pantomime is not getting us anywhere, so I call Balazs to translate. They want to know if they can do the repairs now. There is a glitch though. The tile that is in there now is no longer being made, so unless we have some hidden spares, they cannot match it. Well, we don't. They wanted to know if we wanted the whole bathroom re-tiled or just the hole. The entire project would be our expense; the hole was on the house. Just the hole, thanks. I suggested plain white tiles since it was low to the floor and to the side, in a not too noticeable place. They said they would be back in 90 minutes and do the work. Okay, but hey guys, we have a 6:30 am flight tomorrow to Amsterdam and have to get up at 3:00 am. They returned after 2 1/2 hours and started working. We did not get to bed until 10:00 pm, a couple of hours later than we had planned, but the work was done and it looks great. They did an excellent job of it.

Pin It Now!